|

|
| Frame from side |

|
| straw to the plate/firestop inside |

|
| Starting the inside stucco, .75 inch thick |

|
| Done inside, will water mist so drying slows down |
|
 |
 |
 |

|
| Beginning frame |

|
| Wire mesh on the outside + straw placement inside |

|
| Outside stucco under tarps because of heat |

|
| Outside done, will mist under tarps to slow drying |

|
| Great group that put this project together, led by Habib Gonzales of Sustainableworks. |
www.sustainableworks.ca
|
 |
 |
 |
|

|
| pre-straw |

|
| Straw to the plate, mesh inside and out |

|
| Habib applying the first coat of plaster |
|
 |
|
|
|